Sunday, September 05, 2010
Login Register
 
 
 
 
 
 
 
  Minimize

General Construction Co.

Engineers & Contractors

It provides civil construction services to private companies and owners since long. From since paving parking lots to building private roads and pioneering major land development, General Construction Co. Has the technical know how, well qualified and experienced personnel, equipment, construction materials, experience and bonding capacity to complete any project on time and within the specified budget. The Project Management is responsible for development process of real estate projects including planning, designing and overall management of the project.

We collaborate continuously with our clients to determine the exact scope of the services needed. Some projects require a turnkey approach, which includes financing, design, leasing, construction, ownership, and management. Other may require only components of these services, such as pre-development activities or construction management. Whatever the scope of the project, Ruknuddin Group works closely with each client to evaluate and meet their exact need.



Scope of activities

Scope of activities of firm is comprehensive and briefly described as:-

  1. To carry on the business of contractors, suppliers, engineers, architecture, exporters and importers of mechanic, machinery, equipment, aitcle of manufacturer of others wise produce of all kinds to or from any country.
  2. To product or other wise acqurice, erect, maintain, reconstruct and adapat any buildings, office, workshop, mills, plants, machinery and other things.
  3. To procure lese or otherwise acqurice land buildings anywhere in Pakistan for the erection of house or houses flats or establishing factory or factories and workshop with suitable plants , engines and machinery with a view to manufacturing, purchase, sale.
  4. To take on lesson or acqurice land for the construction of houses the reon for the purpose of saling or leasing them out.
  5. To enter in to any contract the purpose of technical guidance and advice to erect to construct maintance, alter, repair, pull down and restore either alone or jointaly with any other companies.
  6. To provide and give technical advice to people of everage means especially to all others for the construction of their dwelling and lodging with the aforasid material, product, things and articles which reduce the cost of construction.
  7. To purchasr , take on kesson or in exchange or other wise acure any rural or personal property, patents, licenses, rights, privileges.
  8. TO products otherwise acure any land, building or premises and true in to account, develop, employ alter, demolish or let out for the purpose of carrying of business restaurants, governments house tavern house keeper to carry on business of impostors and exporters and manufacturers aired minerals distilled waters or other drinks of caterers for public amusement and entertainment
  9. To acts as manufacturings representative producers representative, auctioneer, commission agent and merchant
  10. To acts and journal contractors metrical and electrical engineers
  11. To carry in business on journal and government constructors.
  12. To carry on business of railway materian public work department KDA buildings canals, irrigation municipalities and autonomous bodies, journal supplies constructors.
  13. To carry on and execute and conduct journal constructing business to submit tenders and undertake to do all sorts of building manufacturing producing farms survey supplying design enlarging repairing remodeling minding administrating controlling and supervision business.
  14. To carry long with the aforesaid business or business such other business or trade which without determined to the main object of the company.
  15. To borrow raise or secure the payment or money by mortgage or by issue of debentures or debentures stock perpetual or otherwise in such a manner as the company shell think fit and for purpose aforesaid to charge any of the company properties or assist including its unsold capital and further to secure any securities of the company by trust deed or other assurance.
  16. To subscribe the contribute money for charitable benevolent public or private general or useful project or for any the purpose which may be consider likely directly or indirectly to further the objects of the company
  17. To establish promote popularizes and other wise assess income of company for the purpose for furthering any of the uses of aforesaid productsartical and thing such as to exhibit display develop models or house etc build by the said material and products and to bear this costs.
  18. To amalgamates or to carry out any business or joint venture system with any other company or companies.
  19. To manage or take part any management and supervision of business or operation of any company person or firm and for that to point out and to remunerate constructor management trustee accountant or other experts and agents
  20. To do any all above in any part of the world either and principal agent trustee or other wise and either alone or in conjunction with otherwise or through agent subcontractor trustee or other wises.
  21. Generally to do all such other thing is may be incidental or the company may think conductive to the attainment of the above project or any of them.
Works Completed:

 





Construction of fish harbour.

Construction of broadcasting house of radio Pakistan.

Construction of Nursing Collage and attached Hostel Jinnah Central Hospital Karachi.

Construction of First floor of OPD Jinnah Central Hospital

Construction of telephone Exchange building Clifton Karachi.

Construction of central telephone Exchange building Clifton Karachi.

Construction of metrological Headquaters Karachi.

Construction of National Liquate library Karachi

Construction of grain Gowdon at Pipri

Construction of residential colony at koringi Creek thermal Power Station

Stationary water supply fitting both at residential coloniesan and KESOCO thermal power station.

Construction of 132 and 11 KV building at Dhabeji

Construction of 132 and 11 KV building of Gharo

Extension in the step down sub station as Elander Road

Construction in the step down sub station as Valikanagar.

Construction of uppron run up by at Karachi airport.

Extension of administration building Karachi Airport.

Construction of type accommodation.

Construction of Residential Colony External Water Supply and Drainage System PMTF Landhi.

Construction of Residential Colony for Pakistan Machine Tools Factory at Landhi

Construction of Residential Housing Colony for HMC Textile

Construction of 135 flats for state bank of Pakistan for staff at north Nazimabad.

Construction of residential colony for Government servants group I, II & III Hyderabad.

Construction of housing colony for Ordance Factory Wah.

Construction of sewearage Pumping Station at Mehmoodabad Karachi.

Construction of Embankment for marine drive at Clifton.

Reclamation of area adjacent to sea shore at Clifton.

70 MGD water purification plant

45 MGD water purification plant along with 10 MG reservoir at COD Hills.

Construction of 25 MGD Water Treatment plant along with 10 MG Reservarior at orange Hills Karachi.

LOW-COST HOUSING



PRIVATE SECTOR ON HIRE PURCHASE

About 5500 Flats. About 500 Houses

WORKS COMPLETED

It is a delight that we are one of the leading engineers and building constructors of the company and have carried out during the last past years major project amounting to millions of rupees of the Government Semi-Government and autonomous bodies and the works in private sectors to the entire satisfaction of the client.

Construction of fish Harbour

Construction of Sewerage treatment plant no ii at Karachi.

Construction of Embankment wall along sea shore at Clifton.

Construction of bulk water supply scheme for greater Karachi consisting of two water treatment plants.

I 25MGD water treatment plant at pipri along with 10 MG reservoir and

II 45 MGD water filtration plant at cod hill along with 10 MG Reservoir.

All these works are of such paramount and unique important that we feel it necessary to give a brief account of their values.

FISH HARBOUR

This way not only for specialized project from their engineering point of view being a marine structure but it was also a project of a commercial nature which on complition has added to the economy of the country

Sewerage treatment plant
Karachi is a metropolitan city which is spread over miles there fore the dipossal of Sewerage and waste water have been one of the greatest to avoid and over the menance treatment plants was designed and erected.

Embankment wall along sea shore at Clifton
Clifton is nearest to sea shore in Karachi and is an attraction of public asumentand entertainment. A stone double front embankment well has been constructed along sea shore at Clifton and in the rear portion of the said embankment area has been reclaimed.

Water treatment Plants 45 MGD and 25 MGD
25 MGD water filtration Plant along with
10 MG reservoir
45 MGD water filtration plant along with
10 MGD reservoir

These two works are one of the paramount importance of Karachi and occupy a unique position as you know that at the time of Independence Karachi has supplies of water approximately 16 MGD for assessed population just over the four lacs. The population of this city has increased over 10 Lacs by 1951 and the inhabitance were experiencing cute shortage of water by the population kept on increasing and Karachi was greadually development itself into a commercial cum industrial city government therefore visulation and formulated a scheme called greater Karachi bulk water supply water trunk main scheme thus the greater Karachi bulk water supply scheme was for bringing ultimately water up to 280 MGD and was divided in to four phase each of 70 MGD KDA has explaied the position of water supply as it was in 1962 at that time at Karachi have effective supply of 85 million gallon per day was utilizing only 55 MGD per year during the last six years up to the summer of 1976 1963 1964 1965 there was insufficient rainfall in Karachi because of absanse of flow in Malir river as a result of the wells at Dumlotee were dry and the supply was reduced barely to 2 MGD.

During the last four years the rate of industrial growth has advance repaidly with the result that there is a constant migration of population job opportunities this resulted in more increasing in demand of portable water than anticipated in 1962 After that time there was uncertainty about the effect on Karachi by the shifting of the capital to rawalpindi it has however been found that inspite of shifting of the cable the population of the Karachi continues to multiply this increase was not expected government had taken a decision to site petro ghemical industries in the koringi area KDA to supply water at 15 MGD. This new need was not possible to be made until the water supply is audmented the national refinery had also pledged a demand for further supply of 5 MGD.

Due to shortage of Water persons residing in displaced persons colony townships were suffering as those colonies were located at some distance from the centre of Karachi ; the effected population is over ten lacs of persons. Without the increase in the supply of water problems of the dwellers will remain unsolved. Atomic Energy Commission had preferred a demand for supply of water at Buleji and Suparco in Hub Choki Road.

Karachi Municipal Corporation was erecting an Abattoir and a cattle colony in landhi meaning to use 3 MGD of water. The first part of this project is sanctioned for bringing in, processing and filteration of 25Mgd, the problem of shortage could not be solved as the demand would have increase by about another 40 MGD during the succeeding years beginning from 1966 up till this time when the first part of the second phase of the project is completed.

After considering and allowing the effect and aspects manifested the authorization concerned called for an International Tender we also participate with our collaborates a frim a international repute messrs degermount of france, who are specialicts and experts in water supply and filteration plant. The work was awarded to us specific instruction that we have to achieve completion in the earliest possible time or shall we say much earlier than the schedule fixed and if we do so, a bonus was declared.By the Grace of God we undertook the work and completed it six months ahead of schedule and earned bonus of Rs.1million.This is for the first time in the history of the country that local firm was awarded a bonus for early completion of a job of a very important and special nature.


 

 

    
Ruknuddin (Pvt.) Ltd. | Real Estate Green Valley | ZOMS Trading | General Construction | Marhaba textiles Ltd. | Agriculture & poultry | Milestones Achieved
Privacy Statement | Terms Of Use
Copyright 2009 by Ruknuddin (Pvt.) Ltd
 
  Powered by :: Webxzone.com